How to Apply for a New MSEDCL Electricity Connection Online in Pune: Documents, Charges and the 3-Day Deadline
Apply for a new MSEDCL electricity connection online. Documents, the wiring test report, charges, and the MERC deadlines of 3, 7 or 15 days.

Photo: Balaji Kasirajan / CC BY-SA 3.0, via Wikimedia Commons
To get a new electricity connection in Pune, apply online on MSEDCL’s (Mahavitaran’s) consumer portal or the Mahavitaran app, upload your ownership or occupancy proof, ID and the wiring test report from a licensed electrical contractor, then pay the charges when MSEDCL sends the demand. Where no new line or transformer is needed, MERC rules say the connection should be given within 3 days in metropolitan areas.
MSEDCL made the process fully online from 1 January 2026, from the application to the final release of the connection, with each stage tracked. That has made the old practice of chasing files at the sub-division office less necessary, though a site inspection still happens.
Step-by-step: apply for a new connection
- Go to the consumer section of mahadiscom.in or open the official Mahavitaran app, and choose New Connection.
- Select the type: residential (LT), commercial, industrial or agricultural, and single-phase or three-phase.
- Enter the applicant’s details, premises address and connected load (the total wattage of appliances you plan to use).
- Upload the documents listed below.
- Submit and note the application number. MSEDCL staff inspect the site.
- Pay the demand note online (service connection charges and security deposit).
- The meter is installed and the connection released. You receive your consumer number.
Documents you will need
- Proof of ownership or occupancy: Index II, sale deed, property card, property tax receipt, or a registered rent agreement with the owner’s NOC
- Photo ID of the applicant: Aadhaar, PAN, voter ID or passport
- Wiring test report from a licensed electrical contractor
- Recent photograph
- For housing society flats, a society NOC if the society requires one; for commercial and industrial loads, licences or permissions as applicable
Renting a flat or shop? A registered agreement is usually accepted with the owner’s consent. Our guide explains how to register a rent agreement online in Pune.
How long should it take?
| Area | MERC time limit (no new infrastructure needed) |
|---|---|
| Metropolitan areas | 3 days |
| Other cities and towns | 7 days |
| Rural areas | 15 days |
These limits start once your application is complete and charges are paid. If a new pole, cable or transformer is required, longer timelines apply under the regulations. If MSEDCL misses the limit without reason, you can complain to the sub-division and then to the Internal Grievance Redressal Cell and the Consumer Grievance Redressal Forum.
Charges
You pay service connection charges, which depend on the load and whether the line is overhead or underground, and a refundable security deposit. The amounts are set under MERC orders and appear on your demand note. Pay only through the official portal, app or MSEDCL offices, and never in cash to a middleman.
After you get the connection
- Register for e-bills and SMS alerts with your consumer number.
- Pay bills online; see how to pay an MSEDCL bill online.
- Check the meter reading on your first bill against the meter.
Frequently asked questions
How do I apply for a new MSEDCL connection online?
Apply on the consumer portal at mahadiscom.in or in the Mahavitaran app, upload your documents and wiring test report, and pay the demand note after inspection.
What documents are required for a new electricity connection in Maharashtra?
Ownership or occupancy proof, photo ID, a wiring test report from a licensed contractor and a photograph. Tenants also need the owner’s consent.
How many days does MSEDCL take for a new connection?
Where no new infrastructure is needed, MERC limits are 3 days in metropolitan areas, 7 days in other cities and 15 days in rural areas.
Can a tenant apply for an MSEDCL connection?
Yes, usually with a registered rent agreement and the owner’s NOC.
What are the charges for a new MSEDCL connection?
Service connection charges and a refundable security deposit, set under MERC orders. The exact amount is shown on your demand note.